Kitchen Remodeling
Kitchen Remodeling in West Palm Beach
RDNS Group Inc. plans and builds kitchens that work as well as they look. We manage layout, cabinetry, countertops, plumbing, electrical, and finishes under one contract, so your kitchen remodel has a single accountable team from consultation to final walkthrough.

What a Kitchen Remodel Includes
A kitchen remodel touches almost every system in the room. We handle the full scope so the pieces come together on one schedule, not five.
Demolition and Layout Changes
We remove the old kitchen safely and rework the layout for better flow, storage, and clearances.
Cabinetry and Countertops
Custom cabinetry built to fit, plus stone or quartz countertops templated and installed.
Plumbing, Electrical, and Finishes
Moved sinks, added circuits, tile, lighting, and paint, all coordinated and permitted where required.
Planning and Material Considerations
The choices you make early shape the budget and the timeline. We help you think through cabinetry construction, counter material, appliance specs, and finish selections, and the lead times that come with each, before construction starts.
Cabinetry and Countertops
Frameless vs. framed, wood species, and stone vs. quartz each carry different lead times and price points.
Appliances and Fixtures
Confirm appliance specs and rough in details early so cabinetry and plumbing are built to fit them.
Our Kitchen Remodel Process
We follow the same sequence on every kitchen: consultation and design, selections and estimate, permitting, demolition, rough in, install, and finishing, with inspections along the way and a final walkthrough with you.
What Affects Cost and Schedule
Cost and timeline depend on the scope, not a fixed number. We give you an itemized estimate after the consultation so you can see what's driving both.
Size and Layout Changes
Moving walls, plumbing, or the kitchen footprint adds structural and trade work.
Finishes and Appliances
Cabinetry, counter, and appliance choices move the budget more than almost anything else.
Permits and Lead Times
Permit timelines and material lead times are built into the schedule up front.
Kitchen Remodeling Questions, Answered
Most clients stay home, though the kitchen is unusable for part of the project. We set up a temporary kitchen area and keep dust and disruption contained.
Yes. We rework layouts, move plumbing, and open walls as needed, permitted and inspected.
Often yes, with some conditions. We'll discuss what you can supply and what we prefer to source to keep the warranty and schedule intact.
Yes. We pull the permits required for the plumbing, electrical, and structural work we perform.